ITAC Assessment: DS0035
ITAC logo
ITAC Assessment: DS0035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Hydraulic Steel Tube Assemblies
NAICS
n/a
SIC 3492: Fluid Power Valves and Hose Fittings
Sales Range $10
M
to 50
M
# of Employees 155
Plant Area 47,590
ft2
Annual Production 80,000
pieces
Production Hrs. Annual 7,774
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,867 969,812
kWh
Natural Gas $17,462 4,092
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,616 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,413

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,389 $14,455 $4,389
126,026
kWh
- - -
02 2.7135: Install occupancy sensors $203 $400 $203
6,741
kWh
- - -
03 2.4133: Use most efficient type of electric motors $808 $2,657 $808
17,878
kWh
- - -
04 2.4221: Install compressor air intakes in coolest locations $172 $240 $172
5,862
kWh
- - -
05 3.4114: Replace city water with recycled water via cooling tower $13,615 $13,000 $(-176.0)
(-5,862)
kWh
- $10,056
-
Tgal
$3,735
-
Tgal
06 2.7231: Use radiant heater for spot heating $7,763 $14,400 - $7,763
-
MMBtu
- -
07 2.6231: Utilize controls to operate equipment only when needed $666 $600 - $666
-
MMBtu
- -
TOTAL RECOMMENDED $27,616 $45,752 $5,396
150,645
kWh
$8,429
-
MMBtu
$10,056
-
Tgal
$3,735
-
Tgal
TOTAL IMPLEMENTED $27,413 $45,352 $5,193
143,904
kWh
$8,429
-
MMBtu
$10,056
-
Tgal
$3,735
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs