ITAC Assessment: GT0763
ITAC logo
ITAC Assessment: GT0763
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product GOLF CAR PARTS
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 79,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,216 3,115,707
kWh
Natural Gas $109,509 20,221
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,654 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,775

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1113: Reduce combustion air flow to optimum $8,000 $1,350 - $8,000
-
MMBtu
02 2.6125: Keep equipment clean $655 - - $655
-
MMBtu
03 2.7111: Reduce illumination to minimum necessary levels $696 $1,680 $696
18,283
kWh
-
04 2.7132: Install timers on light switches in little used areas $81 $110 $81
2,138
kWh
-
05 2.4133: Use most efficient type of electric motors $3,266 $11,300 $3,266
85,807
kWh
-
06 2.4226: Use / purchase optimum sized compressor $2,086 $7,250 $2,086
54,827
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,795 $12,447 $1,795
51,583
kWh
-
08 2.4133: Use most efficient type of electric motors $2,503 $19,339 $2,503
67,418
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $536 $5,146 $536
14,076
kWh
-
10 2.1111: Control pressure on steamer operations $11,010 $5,823 - $11,010
-
MMBtu
11 2.2628: Utilize a less expensive cooling method $8,026 $1,500 $8,026
210,900
kWh
-
TOTAL RECOMMENDED $38,654 $65,945 $18,989
505,032
kWh
$19,665
-
MMBtu
TOTAL IMPLEMENTED $11,775 $25,945 $3,120
83,632
kWh
$8,655
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs