ITAC Assessment: DS0024
ITAC logo
ITAC Assessment: DS0024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Electrical Fasteners
NAICS
n/a
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $1
M
to 5
M
# of Employees 53
Plant Area 25,560
ft2
Annual Production 480,000,000
pieces
Production Hrs. Annual 6,916
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,618 811,547
kWh
Natural Gas $5,281 1,036
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,271 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,101

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,142 $5,331 $1,142
24,912
kWh
-
02 2.7135: Install occupancy sensors $546 $600 $546
13,775
kWh
-
03 2.4133: Use most efficient type of electric motors $2,101 $4,673 $2,101
46,307
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $387 $856 $387
9,672
kWh
-
05 2.3212: Optimize plant power factor $1,416 $9,400 $1,416
-
kWh
-
06 2.2511: Insulate bare equipment $604 $45 $604
15,240
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $176 $240 $176
4,396
kWh
-
08 2.7261: Install timers and/or thermostats $899 $1,050 - $899
-
MMBtu
TOTAL RECOMMENDED $7,271 $22,195 $6,372
114,302
kWh
$899
-
MMBtu
TOTAL IMPLEMENTED $2,101 $4,673 $2,101
46,307
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs