Assessment Year | 1994 |
---|---|
Principal Product | Mobile Homes |
NAICS |
n/a
|
SIC | 2451: Mobile Homes |
Sales Range | $10 M to 50M |
# of Employees | 270 |
Plant Area |
65,600
ft2
|
Annual Production | 700
pieces
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $53,399 | 1,313,892 |
kWh
|
$0.041 |
Natural Gas | $37,927 | 8,385 |
MMBtu
|
$4.52 |
LPG | $9,117 | 1,386 |
MMBtu
|
$6.58 |
Fuel Oil #2 | $304 | 36 |
MMBtu
|
$8.44 |
Other Energy | $4,866 | 535 |
MMBtu
|
$9.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,312 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,431 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | LPG Savings | Administrative Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $986 | $3,642 |
$986
23,154
kWh
|
- | - | - | - | |
02 | 2.7135: Install occupancy sensors | $996 | $360 |
$996
23,154
kWh
|
- | - | - | - | |
03 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $791 | $1,080 |
$791
18,464
kWh
|
- | - | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $329 | $132 |
$329
7,620
kWh
|
- | - | - | - | |
05 | 2.2437: Recover waste heat from equipment | $1,476 | $1,350 | - |
$1,476
-
MMBtu
|
- | - | - | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $5,168 | $10,209 | - |
$2,526
-
MMBtu
|
$2,642
-
MMBtu
|
- | - | |
07 | 2.7231: Use radiant heater for spot heating | $15,539 | $28,800 | - |
$15,539
-
MMBtu
|
- | - | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $164 | $744 |
$164
3,810
kWh
|
- | - | - | - | |
09 | 2.4133: Use most efficient type of electric motors | $620 | $2,926 |
$620
14,361
kWh
|
- | - | - | - | |
10 | 2.1335: Replace gasoline with diesel, lpg, or natural gas | $1,640 | $3,800 | - | - | - | - | $1,640 | |
11 | 2.8114: Change rate schedules or other changes in utility service | $603 | - | - | - | - | $603 | - | |
TOTAL RECOMMENDED | $28,312 | $53,043 |
$3,886
90,563
kWh
|
$19,541
-
MMBtu
|
$2,642
-
MMBtu
|
$603 | $1,640 | ||
TOTAL IMPLEMENTED | $4,431 | $8,924 |
$1,315
30,774
kWh
|
$1,476
-
MMBtu
|
- | - | $1,640 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | LPG Savings | Administrative Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs