| Assessment Year | 2026 |
|---|---|
| Principal Product | Manufactured Fire Logs |
| NAICS | 321999: All Other Miscellaneous Wood Product Manufacturing |
| SIC | 2499: Wood Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 65 |
| Plant Area |
915,000
ft2
|
| Annual Production | 5,500,000
units
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $579,484 | 2,852,252 |
kWh
|
$0.20 | |
| Electricity Demand | $282,240 | 12,815 |
kW-mo/yr
|
$22.02 | |
| Natural Gas | $251,636 | 15,257 |
MMBtu
|
$16.49 | |
| Waste Disposal Costs | |||||
| Water Usage | $19,854 | 2,102 |
Tgal
|
$9.45 | |
| TOTAL YEARLY COSTS | $1,133,214 | ||||
| RECOMMENDED SAVINGS* | $598,530 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,089 | - |
$6,665
32,804
kWh
|
- | - | - | $(-576.0) | - | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $12,742 | - | - | - |
$14,742
-
MMBtu
|
- | $(-2,000.0) | - | |
| 03 | 2.2511: Insulate bare equipment | $32,635 | $5,216 | - | - |
$32,635
-
MMBtu
|
- | - | - | |
| 04 | 2.2136: Install / repair insulation on steam lines | $4,102 | $704 |
$1,787
8,796
kWh
|
- |
$2,315
-
MMBtu
|
- | - | - | |
| 05 | 2.2121: Increase amount of condensate returned | $36,139 | $12,871 | - | - |
$24,680
-
MMBtu
|
$11,459
-
Tgal
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,573 | $21,286 |
$8,749
43,059
kWh
|
$3,288
-
kW-mo/yr
|
- | - | $381 | $155 | |
| 07 | 2.7224: Reduce space conditioning during non-working hours | $2,498 | $4,220 |
$1,283
6,314
kWh
|
- |
$1,215
-
MMBtu
|
- | - | - | |
| 08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,656 | $39,003 |
$10,656
52,443
kWh
|
- | - | - | - | - | |
| 09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,065 | $7,866 |
$2,065
10,163
kWh
|
- | - | - | - | - | |
| 10 | 2.9114: Use solar heat to make electricty | $170,020 | $810,774 |
$170,020
836,711
kWh
|
- | - | - | - | - | |
| 11 | 2.9121: Install wind powered electric generator | $309,011 | $1,481,000 |
$365,151
1,797,005
kWh
|
- | - | - | $(-8,821.0) | $(-47,319.0) | |
| TOTAL RECOMMENDED | $598,530 | $2,382,940 |
$566,376
2,787,295
kWh
|
$3,288
-
kW-mo/yr
|
$75,587
-
MMBtu
|
$11,459
-
Tgal
|
$(-11,016.0) | $(-47,164.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs