ITAC Assessment: SF0647
ITAC logo
ITAC Assessment: SF0647
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Manufactured Fire Logs
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 915,000
ft2
Annual Production 5,500,000
units
Production Hrs. Annual 2,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $579,484 2,852,252
kWh
Electricity Demand $282,240 12,815
kW-mo/yr
Natural Gas $251,636 15,257
MMBtu
Waste Disposal Costs
Water Usage $19,854 2,102
Tgal
TOTAL YEARLY COSTS $1,133,214
RECOMMENDED SAVINGS* $598,530 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,089 - $6,665
32,804
kWh
- - - $(-576.0) -
02 2.1233: Analyze flue gas for proper air/fuel ratio $12,742 - - - $14,742
-
MMBtu
- $(-2,000.0) -
03 2.2511: Insulate bare equipment $32,635 $5,216 - - $32,635
-
MMBtu
- - -
04 2.2136: Install / repair insulation on steam lines $4,102 $704 $1,787
8,796
kWh
- $2,315
-
MMBtu
- - -
05 2.2121: Increase amount of condensate returned $36,139 $12,871 - - $24,680
-
MMBtu
$11,459
-
Tgal
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $12,573 $21,286 $8,749
43,059
kWh
$3,288
-
kW-mo/yr
- - $381 $155
07 2.7224: Reduce space conditioning during non-working hours $2,498 $4,220 $1,283
6,314
kWh
- $1,215
-
MMBtu
- - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,656 $39,003 $10,656
52,443
kWh
- - - - -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,065 $7,866 $2,065
10,163
kWh
- - - - -
10 2.9114: Use solar heat to make electricty $170,020 $810,774 $170,020
836,711
kWh
- - - - -
11 2.9121: Install wind powered electric generator $309,011 $1,481,000 $365,151
1,797,005
kWh
- - - $(-8,821.0) $(-47,319.0)
TOTAL RECOMMENDED $598,530 $2,382,940 $566,376
2,787,295
kWh
$3,288
-
kW-mo/yr
$75,587
-
MMBtu
$11,459
-
Tgal
$(-11,016.0) $(-47,164.0)
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs