ITAC Assessment: DL0276
ITAC logo
ITAC Assessment: DL0276
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Educational services
NAICS 611710: Educational Support Services
SIC 8299: Schools and Educational Services, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 10
Plant Area 450,000
ft2
Annual Production 1
units
Production Hrs. Annual 3,900
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $435,894 3,789,503
kWh
Electricity Demand $68,020 9,798
kW-mo/yr
Electricity Fees $9,475 -
Natural Gas $71,944 6,014
MMBtu
Other Gas $741 1
MMBtu
TOTAL YEARLY COSTS $586,074
RECOMMENDED SAVINGS* $130,877 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $51,529 $1,134 $51,529
387,436
kWh
-
02 2.6231: Utilize controls to operate equipment only when needed $19,851 $1,416 $19,851
149,259
kWh
-
03 2.2522: Isolate hot or cold equipment $21,989 $62,000 $4,551
34,215
kWh
$17,438
-
MMBtu
04 2.6231: Utilize controls to operate equipment only when needed $3,506 - $3,506
26,362
kWh
-
05 2.7221: Lower temperature during the winter season and vice-versa $1,052 - $1,052
7,911
kWh
-
06 2.7261: Install timers and/or thermostats $1,105 $20 $1,105
8,314
kWh
-
07 2.7261: Install timers and/or thermostats $273 $26 $273
2,053
kWh
-
08 2.7261: Install timers and/or thermostats $4,407 $2,111 $4,407
33,135
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $23,276 $24,877 $23,276
175,008
kWh
-
10 2.6223: Schedule use of elevators to conserve energy $3,889 - $3,889
29,238
kWh
-
TOTAL RECOMMENDED $130,877 $91,583 $113,439
852,931
kWh
$17,438
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs