ITAC Assessment: DL0267
ITAC logo
ITAC Assessment: DL0267
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Chemical and Biological Testing Kits
NAICS 325413: In-Vitro Diagnostic Substance Manufacturing
SIC 2835: In Vitro and In Vivo Diagnostic Substances
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 25,000
ft2
Annual Production 50,000
units
Production Hrs. Annual 2,250
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,449 564,976
kWh
Electricity Demand $8,440 1,156
kW-mo/yr
Electricity Fees $2,010 -
LPG $44,352 1,725
MMBtu
Other Gas $40 1
MMBtu
Waste Disposal Costs
Water Usage $3,000 165
Tgal
TOTAL YEARLY COSTS $142,291
RECOMMENDED SAVINGS* $20,643 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.7261: Install timers and/or thermostats $6,108 - $5,549
37,241
kWh
$559
-
kW-mo/yr
-
02 2.7261: Install timers and/or thermostats $8,541 $220 $3,671
24,636
kWh
$369
-
kW-mo/yr
$4,501
-
MMBtu
03 2.2211: Use optimum temperature $584 - $531
3,564
kWh
$53
-
kW-mo/yr
-
04 2.6232: Install set-back timers $362 $177 $329
2,210
kWh
$33
-
kW-mo/yr
-
05 2.4239: Eliminate or reduce compressed air usage $641 $94 $583
3,910
kWh
$58
-
kW-mo/yr
-
06 2.6218: Turn off equipment when not in use $585 - $531
3,565
kWh
$54
-
kW-mo/yr
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $322 $1,000 $292
1,962
kWh
$30
-
kW-mo/yr
-
08 2.2515: Use optimum thickness insulation $481 $474 - - $481
-
MMBtu
09 2.7142: Utilize higher efficiency lamps and/or ballasts $3,019 $1,630 $2,743
18,406
kWh
$277
-
kW-mo/yr
-
TOTAL RECOMMENDED $20,643 $3,595 $14,229
95,494
kWh
$1,432
-
kW-mo/yr
$4,982
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs