ITAC Assessment: DL0233
ITAC logo
ITAC Assessment: DL0233
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Precision machined metal parts
NAICS 333249: Other Industrial Machinery Manufacturing
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 16
Plant Area 13,500
ft2
Annual Production 800,000
units
Production Hrs. Annual 4,600
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,036 483,893
kWh
Electricity Demand $4,869 1,257
kW-mo/yr
Electricity Fees $792 -
Natural Gas $7,000 700
MMBtu
Waste Disposal Costs
Water Usage $1,157 77
Tgal
TOTAL YEARLY COSTS $76,854
RECOMMENDED SAVINGS* $10,150 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6231: Utilize controls to operate equipment only when needed $265 - $265
1,893
kWh
-
02 2.2211: Use optimum temperature $516 - $241
1,718
kWh
$275
-
MMBtu
03 2.2211: Use optimum temperature $769 $1,439 - $769
-
MMBtu
04 2.4224: Upgrade controls on compressors $7,260 $30,000 $7,260
51,859
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $699 $319 $699
4,995
kWh
-
06 2.7491: Insulate glazing, walls, ceilings, and roofs $641 $2,820 - $641
-
MMBtu
TOTAL RECOMMENDED $10,150 $34,578 $8,465
60,465
kWh
$1,685
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs