Assessment Year | 2000 |
---|---|
Principal Product | Heat Treating, Metal Finishing, Specialty Coatings |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $10 M to 50M |
# of Employees | 135 |
Plant Area |
105,750
ft2
|
Annual Production | 82,000,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $227,958 | 6,756,741 |
kWh
|
$0.034 |
Electricity Demand | $175,133 | 12,472 |
kW-mo/yr
|
$14.04 |
Electricity Fees | $29,715 | - |
|
- |
Natural Gas | $426,871 | 161,146 |
MMBtu
|
$2.65 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $39,074 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,162 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.6192: Use a less expensive method of waste removal | $20,162 | - | - | - | - |
$20,162
-
lb
|
|
02 | 2.3132: Recharge batteries on during off-peak demand periods | $7,614 | $15,000 | - |
$7,614
-
kW-mo/yr
|
- | - | |
03 | 2.2621: Modify refrigeration system to operate at a lower pressure | $6,918 | $20,750 |
$4,624
130,715
kWh
|
$2,294
-
kW-mo/yr
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,730 | $740 |
$1,235
34,877
kWh
|
$495
-
kW-mo/yr
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $489 | $90 |
$339
9,672
kWh
|
$150
-
kW-mo/yr
|
- | - | |
06 | 2.2511: Insulate bare equipment | $1,567 | $3,871 | - | - |
$1,567
-
MMBtu
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $594 | $438 |
$346
9,672
kWh
|
$248
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $39,074 | $40,889 |
$6,544
184,936
kWh
|
$10,801
-
kW-mo/yr
|
$1,567
-
MMBtu
|
$20,162
-
lb
|
||
TOTAL IMPLEMENTED | $20,162 | - | - | - | - |
$20,162
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs