ITAC Assessment: DL0227
ITAC logo
ITAC Assessment: DL0227
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Beer and alcoholic beverages distributor
NAICS 424810: Beer and Ale Merchant Wholesalers
SIC 5181: Beer and Ale
Sales Range less than $500
k
# of Employees 150
Plant Area 190,000
ft2
Annual Production 1
units
Production Hrs. Annual 4,940
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,643 1,129,382
kWh
Electricity Demand $12,096 3,216
kW-mo/yr
Electricity Fees $532 -
Natural Gas $44,628 3,797
MMBtu
Waste Disposal Costs
Water Usage $5,120 374
Tgal
TOTAL YEARLY COSTS $171,019
RECOMMENDED SAVINGS* $35,816 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,149

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6231: Utilize controls to operate equipment only when needed $10,298 - $10,298
96,241
kWh
-
02 2.6231: Utilize controls to operate equipment only when needed $8,653 - $8,653
80,871
kWh
-
03 2.6212: Turn off equipment during breaks, reduce operating time $1,027 $552 $1,027
9,599
kWh
-
04 2.2211: Use optimum temperature $6,362 - - $6,362
-
MMBtu
05 2.7231: Use radiant heater for spot heating $3,640 $10,608 $6,509
60,830
kWh
$(-2,869.0)
-
MMBtu
06 2.7261: Install timers and/or thermostats $5,836 $30,292 $5,836
54,543
kWh
-
TOTAL RECOMMENDED $35,816 $41,452 $32,323
302,084
kWh
$3,493
-
MMBtu
TOTAL IMPLEMENTED $31,149 $30,292 $24,787
231,655
kWh
$6,362
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs