ITAC Assessment: DL0208
ITAC logo
ITAC Assessment: DL0208
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Food processing equipment
NAICS 333318: Other Commercial and Service Industry Machinery Manufacturing
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 375,000
ft2
Annual Production 485,912
units
Production Hrs. Annual 4,375
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $299,406 4,388,315
kWh
Electricity Demand $66,045 12,650
kW-mo/yr
Electricity Fees $7,898 -
Natural Gas $75,372 7,459
MMBtu
Waste Disposal Costs
Water Usage $18,812 1,612
Tgal
TOTAL YEARLY COSTS $467,533
RECOMMENDED SAVINGS* $108,608 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $66,863

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $25,361 $3,000 - - $25,361
-
MMBtu
02 2.7311: Ventilation system to shut off when room is not in use $8,504 - - - $8,504
-
MMBtu
03 2.7314: Reduce ventilation air $4,894 - $4,010
58,963
kWh
$885
-
kW-mo/yr
-
04 2.6218: Turn off equipment when not in use $583 - $478
7,026
kWh
$105
-
kW-mo/yr
-
05 2.7261: Install timers and/or thermostats $3,567 $71 $705
10,363
kWh
$155
-
kW-mo/yr
$2,707
-
MMBtu
06 2.7261: Install timers and/or thermostats $627 $96 $514
7,552
kWh
$113
-
kW-mo/yr
-
07 2.4226: Use / purchase optimum sized compressor $23,194 $11,933 $19,003
279,450
kWh
$4,191
-
kW-mo/yr
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,331 $2,230 $1,910
28,086
kWh
$421
-
kW-mo/yr
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $24,770 $33,570 $20,294
298,432
kWh
$4,476
-
kW-mo/yr
-
10 2.4322: Use or replace with energy efficient substitutes $11,982 $55,000 $9,817
144,360
kWh
$2,166
-
kW-mo/yr
-
11 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,359 $7,840 $4,018
59,087
kWh
$886
-
kW-mo/yr
$(-2,545.0)
-
MMBtu
12 2.4322: Use or replace with energy efficient substitutes $436 $2,500 $357
5,256
kWh
$79
-
kW-mo/yr
-
TOTAL RECOMMENDED $108,608 $116,240 $61,105
898,575
kWh
$13,476
-
kW-mo/yr
$34,027
-
MMBtu
TOTAL IMPLEMENTED $66,863 $105,304 $52,564
772,973
kWh
$11,592
-
kW-mo/yr
$2,707
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs