Assessment Year | 2004 |
---|---|
Principal Product | Heat Treated and Brazed Parts |
NAICS | 332811: Metal Heat Treating |
SIC | 3398: Metal Heat Treating |
Sales Range | $1 M to 5M |
# of Employees | 21 |
Plant Area |
18,000
ft2
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 6,648
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $113,476 | 1,157,280 |
kWh
|
$0.098 |
Electricity Demand | $54,601 | 5,408 |
kW-mo/yr
|
$10.10 |
Natural Gas | $78,794 | 9,724 |
MMBtu
|
$8.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $30,000 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,503 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $2,527 | $2,527 |
$2,527
22,068
kWh
|
- | - | |
02 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $956 | $180 |
$816
8,325
kWh
|
$140
-
kW-mo/yr
|
- | |
03 | 2.7135: Install occupancy sensors | $1,280 | $1,280 |
$1,126
11,482
kWh
|
$154
-
kW-mo/yr
|
- | |
04 | 2.4239: Eliminate or reduce compressed air usage | $864 | $1,183 |
$729
7,434
kWh
|
$135
-
kW-mo/yr
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,525 | $12,060 |
$7,188
73,311
kWh
|
$1,337
-
kW-mo/yr
|
- | |
06 | 2.4131: Size electric motors for peak operating efficiency | $270 | $885 |
$228
2,347
kWh
|
$42
-
kW-mo/yr
|
- | |
07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,506 | $6,000 |
$3,916
39,936
kWh
|
$970
-
kW-mo/yr
|
$(-1,380.0)
-
MMBtu
|
|
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,750 | $6,748 |
$3,195
32,582
kWh
|
$555
-
kW-mo/yr
|
- | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $449 | $960 |
$379
3,864
kWh
|
$70
-
kW-mo/yr
|
- | |
10 | 2.8114: Change rate schedules or other changes in utility service | $7,873 | $100 |
$7,873
-
kWh
|
- | - | |
TOTAL RECOMMENDED | $30,000 | $31,923 |
$27,977
201,349
kWh
|
$3,403
-
kW-mo/yr
|
$(-1,380.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $7,503 | $10,340 |
$6,766
65,322
kWh
|
$737
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs