ITAC Assessment: SF0289
ITAC logo
ITAC Assessment: SF0289
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Heat Treated and Brazed Parts
NAICS 332811: Metal Heat Treating
SIC 3398: Metal Heat Treating
Sales Range $1
M
to 5
M
# of Employees 21
Plant Area 18,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 6,648
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,476 1,157,280
kWh
Electricity Demand $54,601 5,408
kW-mo/yr
Natural Gas $78,794 9,724
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,000 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,503

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $2,527 $2,527 $2,527
22,068
kWh
- -
02 2.1121: Use insulation in furnaces to facilitate heating / cooling $956 $180 $816
8,325
kWh
$140
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $1,280 $1,280 $1,126
11,482
kWh
$154
-
kW-mo/yr
-
04 2.4239: Eliminate or reduce compressed air usage $864 $1,183 $729
7,434
kWh
$135
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,525 $12,060 $7,188
73,311
kWh
$1,337
-
kW-mo/yr
-
06 2.4131: Size electric motors for peak operating efficiency $270 $885 $228
2,347
kWh
$42
-
kW-mo/yr
-
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,506 $6,000 $3,916
39,936
kWh
$970
-
kW-mo/yr
$(-1,380.0)
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $3,750 $6,748 $3,195
32,582
kWh
$555
-
kW-mo/yr
-
09 2.4231: Reduce the pressure of compressed air to the minimum required $449 $960 $379
3,864
kWh
$70
-
kW-mo/yr
-
10 2.8114: Change rate schedules or other changes in utility service $7,873 $100 $7,873
-
kWh
- -
TOTAL RECOMMENDED $30,000 $31,923 $27,977
201,349
kWh
$3,403
-
kW-mo/yr
$(-1,380.0)
-
MMBtu
TOTAL IMPLEMENTED $7,503 $10,340 $6,766
65,322
kWh
$737
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings