ITAC Assessment: WV0311
ITAC logo
ITAC Assessment: WV0311
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Kiln Dried Hardwood Lumber and Hardwood Flooring
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 175,000
ft2
Annual Production 23,000
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $379,494 10,211,753
kWh
Electricity Demand $236,050 24,297
kW-mo/yr
Electricity Fees $19,624 -
Wood $83,025 95,313
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $178,488 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,295

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings Personnel Changes Savings
01 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $137,755 $1,055,656 $150,879
3,877,855
kWh
$57,446
-
kW-mo/yr
$(-70,570.0)
-
MMBtu
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $12,082 $5,425 $6,874
176,679
kWh
$5,208
-
kW-mo/yr
- -
03 2.4151: Develop a repair/replace policy $8,791 $869 $5,714
146,793
kWh
$4,577
-
kW-mo/yr
- $(-1,500.0)
04 2.6212: Turn off equipment during breaks, reduce operating time $6,268 $25 $4,663
119,837
kWh
$1,605
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,074 $5,296 $2,367
55,841
kWh
$1,707
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,839 $50 $1,778
45,806
kWh
$1,061
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,113 - $1,043
26,815
kWh
$1,070
-
kW-mo/yr
- -
08 2.2113: Repair or replace steam traps $1,475 $1,000 - - $1,925
-
MMBtu
$(-450.0)
09 2.2511: Insulate bare equipment $1,173 $885 - - $1,173
-
MMBtu
-
10 2.4221: Install compressor air intakes in coolest locations $905 $980 $577
14,824
kWh
$328
-
kW-mo/yr
- -
11 2.7135: Install occupancy sensors $533 $2,113 $341
8,291
kWh
$192
-
kW-mo/yr
- -
12 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $480 $158 $279
7,159
kWh
$201
-
kW-mo/yr
- -
TOTAL RECOMMENDED $178,488 $1,072,457 $174,515
4,479,900
kWh
$73,395
-
kW-mo/yr
$(-67,472.0)
-
MMBtu
$(-1,950.0)
TOTAL IMPLEMENTED $39,295 $13,708 $22,718
578,930
kWh
$15,429
-
kW-mo/yr
$3,098
-
MMBtu
$(-1,950.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs