ITAC Assessment: DL0194
ITAC logo
ITAC Assessment: DL0194
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Plastic containers
NAICS 326160: Plastics Bottle Manufacturing
SIC 3085: Plastics Bottles
Sales Range $1
M
to 5
M
# of Employees 38
Plant Area 240,000
ft2
Annual Production 130,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $509,768 7,852,173
kWh
Electricity Demand $96,735 15,609
kW-mo/yr
Electricity Fees $5,941 -
Natural Gas $39,417 4,722
MMBtu
TOTAL YEARLY COSTS $651,861
RECOMMENDED SAVINGS* $78,372 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,315

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6231: Utilize controls to operate equipment only when needed $3,325 $475 - $3,325
-
MMBtu
02 2.6218: Turn off equipment when not in use $52,057 $15,000 $52,057
676,060
kWh
-
03 2.4322: Use or replace with energy efficient substitutes $1,097 $1,527 $1,097
14,250
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,663 $1,698 $11,663
151,500
kWh
-
05 2.4224: Upgrade controls on compressors $3,230 $13,750 $3,230
41,950
kWh
-
06 2.6231: Utilize controls to operate equipment only when needed $7,000 $114 $7,000
90,900
kWh
-
TOTAL RECOMMENDED $78,372 $32,564 $75,047
974,660
kWh
$3,325
-
MMBtu
TOTAL IMPLEMENTED $19,315 $17,450 $15,990
207,700
kWh
$3,325
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs