ITAC Assessment: DL0188
ITAC logo
ITAC Assessment: DL0188
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Bottled Beverages
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $100
M
to 500
M
# of Employees 106
Plant Area 133,000
ft2
Annual Production 65,500
Tgal
Production Hrs. Annual 7,488
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $628,556 13,458,137
kWh
Electricity Demand $215,645 35,184
kW-mo/yr
Electricity Fees $8,954 -
Natural Gas $133,878 35,892
MMBtu
Waste Disposal Costs
Water Usage $760,948 122,919
Tgal
TOTAL YEARLY COSTS $1,747,981
RECOMMENDED SAVINGS* $299,705 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $76,388

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
01 3.4154: Eliminate leaks in water lines and valves $900 - - $280
-
MMBtu
$620
-
Tgal
-
02 3.4155: Meter waste water $172,100 $3,000 - - - $172,100
-
Tgal
03 3.4114: Replace city water with recycled water via cooling tower $23,050 $9,490 - - $23,050
-
Tgal
-
04 2.4322: Use or replace with energy efficient substitutes $860 $81,000 $860
13,700
kWh
- - -
05 2.6231: Utilize controls to operate equipment only when needed $8,798 $1,000 $8,798
139,651
kWh
- - -
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,987 $20,000 - $1,987
-
MMBtu
- -
07 2.2441: Preheat boiler makeup water with waste process heat $1,320 $8,000 - $1,320
-
MMBtu
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,340 $48,750 $19,340
307,000
kWh
- - -
09 2.2437: Recover waste heat from equipment $7,620 $7,000 $780
12,450
kWh
$6,840
-
MMBtu
- -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,490 $25,000 $17,490
277,600
kWh
- - -
11 2.4226: Use / purchase optimum sized compressor $3,150 $4,600 $3,150
50,000
kWh
- - -
12 2.4226: Use / purchase optimum sized compressor $25,290 $57,350 $25,290
401,400
kWh
- - -
13 2.2437: Recover waste heat from equipment $6,000 $5,500 - $6,000
-
MMBtu
- -
14 2.1221: Replace obsolete burners with more efficient ones $11,800 $9,120 - $11,800
-
MMBtu
- -
TOTAL RECOMMENDED $299,705 $279,810 $75,708
1,201,801
kWh
$28,227
-
MMBtu
$23,670
-
Tgal
$172,100
-
Tgal
TOTAL IMPLEMENTED $76,388 $173,840 $52,438
832,351
kWh
$280
-
MMBtu
$23,670
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs