| Assessment Year | 1989 |
|---|---|
| Principal Product | STUD & DIMENSION LUMBER |
| NAICS |
n/a
|
| SIC | 2421: Sawmills and Planing Mills, General |
| Sales Range | $10 M to 50M |
| # of Employees | 175 |
| Plant Area |
n/a
|
| Annual Production | 180,000
thousand feet
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,015,633 | 23,231,536 |
kWh
|
$0.044 |
| Wood | $175,200 | 175,199 |
MMBtu
|
$1.00 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $49,767 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $44,889 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $5,485 | $500 |
$5,485
125,440
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,970 | $5,000 |
$7,970
182,298
kWh
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $1,110 | $826 |
$1,110
25,498
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,348 | $1,893 |
$1,282
29,015
kWh
|
$1,066 | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $27,976 | $16,000 |
$29,187
667,937
kWh
|
$(-1,211.0) | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,878 | $8,830 |
$4,878
133,939
kWh
|
- | |
| TOTAL RECOMMENDED | $49,767 | $33,049 |
$49,912
1,164,127
kWh
|
$(-145.0) | ||
| TOTAL IMPLEMENTED | $44,889 | $24,219 |
$45,034
1,030,188
kWh
|
$(-145.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs