ITAC Assessment: OR0059
ITAC logo
ITAC Assessment: OR0059
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product STUD & DIMENSION LUMBER
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area
n/a
Annual Production 180,000
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,015,633 23,231,536
kWh
Wood $175,200 175,199
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,767 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,889

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $5,485 $500 $5,485
125,440
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,970 $5,000 $7,970
182,298
kWh
-
03 2.4133: Use most efficient type of electric motors $1,110 $826 $1,110
25,498
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,348 $1,893 $1,282
29,015
kWh
$1,066
05 2.7142: Utilize higher efficiency lamps and/or ballasts $27,976 $16,000 $29,187
667,937
kWh
$(-1,211.0)
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,878 $8,830 $4,878
133,939
kWh
-
TOTAL RECOMMENDED $49,767 $33,049 $49,912
1,164,127
kWh
$(-145.0)
TOTAL IMPLEMENTED $44,889 $24,219 $45,034
1,030,188
kWh
$(-145.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs