ITAC Assessment: DL0182
ITAC logo
ITAC Assessment: DL0182
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Rat, Mouse, and Pest Traps
NAICS 332510: Hardware Manufacturing
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 140,000
ft2
Annual Production 57,000,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,896 2,170,960
kWh
Electricity Demand $24,441 5,657
kW-mo/yr
Electricity Fees $1,440 -
Natural Gas $62,613 10,194
MMBtu
Waste Disposal Costs
Water Usage $6,968 129
Tgal
TOTAL YEARLY COSTS $239,358
RECOMMENDED SAVINGS* $57,754 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,610

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $1,910 - $1,910
24,500
kWh
-
02 2.7313: Recycle air for heating, ventilation and air conditioning $33,900 $25,200 $5,820
74,600
kWh
$28,080
-
MMBtu
03 2.7491: Insulate glazing, walls, ceilings, and roofs $3,280 $9,306 - $3,280
-
MMBtu
04 2.7261: Install timers and/or thermostats $4,920 $60 - $4,920
-
MMBtu
05 2.7314: Reduce ventilation air $290 - $290
3,730
kWh
-
06 2.6231: Utilize controls to operate equipment only when needed $2,140 $2,150 $2,140
27,400
kWh
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,320 $1,000 $1,320
16,900
kWh
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $349 $1,440 $349
4,476
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $800 $879 $800
10,260
kWh
-
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,845 $1,900 $8,845
113,400
kWh
-
TOTAL RECOMMENDED $57,754 $41,935 $21,474
275,266
kWh
$36,280
-
MMBtu
TOTAL IMPLEMENTED $36,610 $26,079 $8,530
109,360
kWh
$28,080
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs