ITAC Assessment: DL0173
ITAC logo
ITAC Assessment: DL0173
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product RF and Microwave Technology
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 100,000
ft2
Annual Production 5,000,000
units
Production Hrs. Annual 4,806
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $261,147 3,541,902
kWh
Electricity Demand $50,243 7,538
kW-mo/yr
Electricity Fees $40,330 -
Natural Gas $5,413 382
MMBtu
Waste Disposal Costs
Water Usage $13,323 1,234,000
Tgal
TOTAL YEARLY COSTS $370,456
RECOMMENDED SAVINGS* $60,855 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,591

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4224: Upgrade controls on compressors $20,880 - $20,880
282,000
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,435 $15,000 $4,435
50,400
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,100 $9,375 $5,100
58,000
kWh
-
04 2.4131: Size electric motors for peak operating efficiency $1,676 $1,375 $1,676
19,049
kWh
-
05 2.2437: Recover waste heat from equipment $2,364 $654 $1,032
11,728
kWh
$1,332
-
MMBtu
06 2.4321: Upgrade obsolete equipment $17,600 $5,950 $17,600
200,000
kWh
-
07 2.6231: Utilize controls to operate equipment only when needed $8,800 $3,940 $8,800
100,000
kWh
-
TOTAL RECOMMENDED $60,855 $36,294 $59,523
721,177
kWh
$1,332
-
MMBtu
TOTAL IMPLEMENTED $44,591 $22,325 $44,591
551,449
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs