ITAC Assessment: MZ0111
ITAC logo
ITAC Assessment: MZ0111
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product steel castings
NAICS 331513: Steel Foundries (except Investment)
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 12
Plant Area 40,000
ft2
Annual Production 1
units
Production Hrs. Annual 4,280
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,081 1,557,900
kWh
Electricity Demand $19,124 7,556
kW-mo/yr
Natural Gas $44,608 5,235
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,162 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,156

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $460 - $437
6,340
kWh
$23
-
kW-mo/yr
-
02 2.4223: Install direct acting units in place of compressed air pressure system in safety system $1,032 $2,500 $983
14,248
kWh
$49
-
kW-mo/yr
-
03 2.4112: Install soft-start to eliminate nuisance trips $283 $680 - $283
-
kW-mo/yr
-
04 2.4223: Install direct acting units in place of compressed air pressure system in safety system $514 $80 - - $514
-
MMBtu
05 2.1135: Repair furnaces and oven doors so that they seal efficiently $7,873 $900 - - $7,873
-
MMBtu
TOTAL RECOMMENDED $10,162 $4,160 $1,421
20,588
kWh
$355
-
kW-mo/yr
$8,386
-
MMBtu
TOTAL IMPLEMENTED $8,156 $1,580 - $283
-
kW-mo/yr
$7,873
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs