ITAC Assessment: MO0153
ITAC logo
ITAC Assessment: MO0153
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product sealant and closed-cell rubber
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 180,000
ft2
Annual Production 10,100,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $444,124 7,194,021
kWh
Natural Gas $183,249 43,180
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $106,328 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,041

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $2,220 $995 - $2,220
-
MMBtu
- -
02 2.8113: Purchase gas directly from a contract gas supplier $26,406 $300 - - - $26,406
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $540 $365 $540
8,499
kWh
- - -
04 2.4133: Use most efficient type of electric motors $2,849 $7,562 $2,849
46,600
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,743 $1,063 $2,743
45,135
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,648 $3,010 $5,648
92,907
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $193 $276 $193
3,224
kWh
- - -
08 2.4221: Install compressor air intakes in coolest locations $4,192 $702 $4,192
65,651
kWh
- - -
09 3.4114: Replace city water with recycled water via cooling tower $61,537 $5,000 $(-256.0)
(-4,396)
kWh
- $61,793
-
Tgal
-
TOTAL RECOMMENDED $106,328 $19,273 $15,909
257,620
kWh
$2,220
-
MMBtu
$61,793
-
Tgal
$26,406
TOTAL IMPLEMENTED $7,041 $8,264 $7,041
112,251
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs