Assessment Year | 2016 |
---|---|
Principal Product | Mechanical Power Transmission |
NAICS | 336211: Motor Vehicle Body Manufacturing |
SIC | 3713: Truck and Bus Bodies |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
9,999
ft2
|
Annual Production | 40,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $117,295 | 846,578 |
kWh
|
$0.14 |
Electricity Demand | $20,119 | 3,030 |
kW-mo/yr
|
$6.64 |
Electricity Fees | $4,465 | - |
|
- |
Natural Gas | $29,476 | 3,686 |
MMBtu
|
$8.00 |
TOTAL YEARLY COSTS | $171,355 | |||
RECOMMENDED SAVINGS* | $40,843 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,095 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $1,095 | $1,036 | - | - |
$1,095
-
MMBtu
|
|
02 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $4,815 | $27,020 |
$(-630.0)
(-3,910)
kWh
|
$(-70.0)
-
kW-mo/yr
|
$5,515
-
MMBtu
|
|
03 | 2.2531: Re-size charging openings or add movable cover or door | $3,496 | $9,820 | - | - |
$3,496
-
MMBtu
|
|
04 | 2.7231: Use radiant heater for spot heating | $1,310 | $2,990 | - | - |
$1,310
-
MMBtu
|
|
05 | 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation | $18,930 | $4,739 |
$14,354
103,266
kWh
|
$1,673
-
kW-mo/yr
|
$2,903
-
MMBtu
|
|
06 | 2.7131: Add area lighting switches | $1,520 | $910 |
$1,490
10,740
kWh
|
$30
-
kW-mo/yr
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,810 | $35,710 |
$5,750
41,360
kWh
|
$60
-
kW-mo/yr
|
- | |
08 | 2.7135: Install occupancy sensors | $2,400 | $3,900 |
$2,400
17,273
kWh
|
- | - | |
09 | 2.4224: Upgrade controls on compressors | $1,467 | $565 |
$1,467
10,559
kWh
|
- | - | |
TOTAL RECOMMENDED | $40,843 | $86,690 |
$24,831
179,288
kWh
|
$1,693
-
kW-mo/yr
|
$14,319
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,095 | $1,036 | - | - |
$1,095
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs