ITAC Assessment: DL0149
ITAC logo
ITAC Assessment: DL0149
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Magnetic Metal Components
NAICS 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
SIC 3677: Electronic Coils, Transformers, and Other Inductors
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 52,000
ft2
Annual Production 100
ton
Production Hrs. Annual 6,000
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $212,140 1,850,226
kWh
Electricity Demand $12,889 5,547
kW-mo/yr
Electricity Fees $24,699 -
Natural Gas $23,397 3,355
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,730 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,330

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $15,210 $630 $14,790
128,610
kWh
$420
-
kW-mo/yr
-
02 2.6231: Utilize controls to operate equipment only when needed $1,780 - $1,780
15,500
kWh
- -
03 2.7261: Install timers and/or thermostats $6,060 $35 - - $6,060
-
MMBtu
04 2.4239: Eliminate or reduce compressed air usage $4,900 $1,250 $3,910
34,010
kWh
$990
-
kW-mo/yr
-
05 2.7311: Ventilation system to shut off when room is not in use $1,140 $40 $300
2,830
kWh
- $840
-
MMBtu
06 2.6214: Shut off pilots in standby equipment $870 $50 - - $870
-
MMBtu
07 2.4239: Eliminate or reduce compressed air usage $4,930 $7,440 $4,440
38,570
kWh
$490
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $470 $1,430 $460
4,000
kWh
$10
-
kW-mo/yr
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $600 $3,200 $570
4,990
kWh
$30
-
kW-mo/yr
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $480 $1,200 $440
3,850
kWh
$40
-
kW-mo/yr
-
11 2.7142: Utilize higher efficiency lamps and/or ballasts $2,290 $29,215 $2,290
19,940
kWh
- -
TOTAL RECOMMENDED $38,730 $44,490 $28,980
252,300
kWh
$1,980
-
kW-mo/yr
$7,770
-
MMBtu
TOTAL IMPLEMENTED $16,330 $13,395 $7,990
69,740
kWh
$570
-
kW-mo/yr
$7,770
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs