ITAC Assessment: AS0267
ITAC logo
ITAC Assessment: AS0267
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Embroidery
NAICS
n/a
SIC 2329: Men's and Boys' Clothing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 91,000
ft2
Annual Production 1,600,000
pieces
Production Hrs. Annual 6,467
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $123,753 1,353,458
kWh
Electricity Demand $6,906 5,057
kW-mo/yr
Electricity Fees $10,593 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $662,082 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $13,649 $30,357 n/a $11,813
155,920
kWh
$1,836
-
kW-mo/yr
- - - -
02 2.7135: Install occupancy sensors $2,547 $2,475 n/a $2,292
30,188
kWh
$255
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,204 $1,012 n/a $769
10,258
kWh
$59
-
kW-mo/yr
- $210 - $166
04 2.7145: Install skylights $2,171 $1,680 n/a $2,171
28,722
kWh
- - - - -
05 2.7232: Replace existing hvac unit with high efficiency model $29,540 $31,800 n/a $26,932
355,217
kWh
$2,608
-
kW-mo/yr
- - - -
06 3.6192: Use a less expensive method of waste removal $2,700 $60 n/a - - - - $2,700 -
07 3.6192: Use a less expensive method of waste removal $1,608 $60 n/a - - - - $1,608 -
08 4.512: Condense operation into one building $604,757 $2,250,000 n/a - $(-1,867.0)
-
kW-mo/yr
$21,599 - $585,025 -
09 4.231: Purchase equipment instead of leasing $3,906 $12,060 n/a - - - - $3,906 -
TOTAL RECOMMENDED $662,082 $2,329,504 $43,977
580,305
kWh
$2,891
-
kW-mo/yr
$21,599 $210 $593,239 $166
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs