| Assessment Year | 2014 |
|---|---|
| Principal Product | Protective masks, enclosures, space suits and aerostats |
| NAICS | 336411: Aircraft Manufacturing |
| SIC | 3721: Aircraft |
| Sales Range | $50 M to 100M |
| # of Employees | 350 |
| Plant Area |
268,500
ft2
|
| Annual Production | 250,000
pieces
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Delaware |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $393,213 | 4,807,288 |
kWh
|
$0.082 |
| Electricity Demand | $45,380 | 12,037 |
kW-mo/yr
|
$3.77 |
| Electricity Fees | $9,851 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $125,090 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $64,100 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.7261: Install timers and/or thermostats | $27,900 | - |
$27,900
300,000
kWh
|
|
| 02 | 2.7241: Install outside air damper / economizer on hvac unit | $19,800 | $1,450 |
$19,800
213,000
kWh
|
|
| 03 | 2.6218: Turn off equipment when not in use | $14,100 | - |
$14,100
172,000
kWh
|
|
| 04 | 2.7314: Reduce ventilation air | $22,400 | - |
$22,400
273,000
kWh
|
|
| 05 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $13,000 | - |
$13,000
140,000
kWh
|
|
| 06 | 2.6212: Turn off equipment during breaks, reduce operating time | $7,480 | - |
$7,480
91,200
kWh
|
|
| 07 | 2.6218: Turn off equipment when not in use | $3,400 | - |
$3,400
36,700
kWh
|
|
| 08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $10,230 | - |
$10,230
110,000
kWh
|
|
| 09 | 2.4239: Eliminate or reduce compressed air usage | $1,170 | $270 |
$1,170
12,600
kWh
|
|
| 10 | 2.7314: Reduce ventilation air | $5,610 | $5,900 |
$5,610
60,920
kWh
|
|
| TOTAL RECOMMENDED | $125,090 | $7,620 |
$125,090
1,409,420
kWh
|
||
| TOTAL IMPLEMENTED | $64,100 | $1,450 |
$64,100
689,700
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs