ITAC Assessment: DL0135
ITAC logo
ITAC Assessment: DL0135
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Protective masks, enclosures, space suits and aerostats
NAICS 336411: Aircraft Manufacturing
SIC 3721: Aircraft
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 268,500
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $393,213 4,807,288
kWh
Electricity Demand $45,380 12,037
kW-mo/yr
Electricity Fees $9,851 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $125,090 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,100

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7261: Install timers and/or thermostats $27,900 - $27,900
300,000
kWh
02 2.7241: Install outside air damper / economizer on hvac unit $19,800 $1,450 $19,800
213,000
kWh
03 2.6218: Turn off equipment when not in use $14,100 - $14,100
172,000
kWh
04 2.7314: Reduce ventilation air $22,400 - $22,400
273,000
kWh
05 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $13,000 - $13,000
140,000
kWh
06 2.6212: Turn off equipment during breaks, reduce operating time $7,480 - $7,480
91,200
kWh
07 2.6218: Turn off equipment when not in use $3,400 - $3,400
36,700
kWh
08 2.4231: Reduce the pressure of compressed air to the minimum required $10,230 - $10,230
110,000
kWh
09 2.4239: Eliminate or reduce compressed air usage $1,170 $270 $1,170
12,600
kWh
10 2.7314: Reduce ventilation air $5,610 $5,900 $5,610
60,920
kWh
TOTAL RECOMMENDED $125,090 $7,620 $125,090
1,409,420
kWh
TOTAL IMPLEMENTED $64,100 $1,450 $64,100
689,700
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs