Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product PACKAGED GAUGE SYSTEMS
NAICS
n/a
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area
n/a
Annual Production 67
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $178,736 4,366,647
kWh
Natural Gas $16,249 4,129
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,551 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $11,038 $1,974 $5,929
214,537
kWh
$5,109
-
MMBtu
02 2.7226: Use computer programs to optimize hvac performance $4,273 $7,966 $3,580
129,836
kWh
$693
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $240 $695 - $240
-
MMBtu
TOTAL RECOMMENDED $15,551 $10,635 $9,509
344,373
kWh
$6,042
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs