ITAC Assessment: DL0081
ITAC logo
ITAC Assessment: DL0081
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Poultry Products
NAICS 311615: Poultry Processing
SIC 2015: Poultry Slaughtering and Processing
Sales Range $500
k
to 1
M
# of Employees 1,200
Plant Area 162,962
ft2
Annual Production 54,600,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,575,902 27,897,000
kWh
Electricity Demand $596,544 59,196
kW-mo/yr
Natural Gas $711,488 99,616
MMBtu
LPG $108,779 4,745
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $584,732 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $152,843

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4224: Upgrade controls on compressors $323,076 $500,000 $323,076
2,834,000
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $51,870 $24,400 $51,870
455,000
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $33,801 $36,000 $33,801
296,500
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $40,818 $54,000 $40,818
358,059
kWh
-
05 2.4222: Install adequate dryers on air lines to eliminate blowdown $18,222 $42,000 $18,222
159,840
kWh
-
06 2.6231: Utilize controls to operate equipment only when needed $24,850 $4,500 $24,850
217,981
kWh
-
07 2.6231: Utilize controls to operate equipment only when needed $28,257 $28,000 $28,257
247,869
kWh
-
08 2.1116: Improve combustion control capability $16,536 $8,900 - $16,536
-
MMBtu
09 2.1243: Use heat from boiler blowdown to preheat boiler feed water $16,536 $25,000 - $16,536
-
MMBtu
10 2.7314: Reduce ventilation air $26,354 $4,500 $26,354
231,175
kWh
-
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,412 $720 $4,412
38,700
kWh
-
TOTAL RECOMMENDED $584,732 $728,020 $551,660
4,839,124
kWh
$33,072
-
MMBtu
TOTAL IMPLEMENTED $152,843 $118,900 $152,843
1,340,734
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs