ITAC Assessment: DL0080
ITAC logo
ITAC Assessment: DL0080
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product corrugated containers
NAICS 322130: Paperboard Mills
SIC 2631: Paperboard Mills
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 156,800
ft2
Annual Production 387,000
units
Production Hrs. Annual 5,840
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $264,000 3,200,000
kWh
Electricity Demand $30,628 11,099
kW-mo/yr
Electricity Fees $71,000 -
Natural Gas $156,866 22,732
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,915 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,980

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,088 $100 $3,088
26,850
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $15,456 $26,650 $15,456
134,400
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $14,835 $380 $14,835
129,000
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,451 $2,160 $4,451
38,700
kWh
-
05 3.8131: Use water-based adhesives $7,845 $145 - $7,845
-
MMBtu
06 2.1233: Analyze flue gas for proper air/fuel ratio $3,140 $10,000 - $3,140
-
MMBtu
07 2.7261: Install timers and/or thermostats $8,500 $112 - $8,500
-
MMBtu
08 2.4221: Install compressor air intakes in coolest locations $1,400 $287 $1,400
12,200
kWh
-
09 2.7135: Install occupancy sensors $6,200 $121 $6,200
54,000
kWh
-
TOTAL RECOMMENDED $64,915 $39,955 $45,430
395,150
kWh
$19,485
-
MMBtu
TOTAL IMPLEMENTED $33,980 $39,055 $22,995
199,950
kWh
$10,985
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs