| Assessment Year | 2018 |
|---|---|
| Principal Product | Beer |
| NAICS | 312120: Breweries |
| SIC | 2082: Malt Beverages |
| Sales Range | $1 M to 5M |
| # of Employees | 40 |
| Plant Area |
20,000
ft2
|
| Annual Production | 310,000
units
|
| Production Hrs. Annual | 3,640
hrs
|
| Location (State) | Louisiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $37,407 | 393,396 |
kWh
|
$0.095 |
| Electricity Demand | $5,589 | 945 |
kW-mo/yr
|
$5.91 |
| Natural Gas | $19,274 | 2,513 |
MMBtu
|
$7.67 |
| TOTAL YEARLY COSTS | $62,270 | |||
| RECOMMENDED SAVINGS* | $2,604 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,121 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $544 | $220 |
$544
5,756
kWh
|
- | - | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $437 | $300 |
$437
4,600
kWh
|
- | - | - | |
| 03 | 2.2511: Insulate bare equipment | $179 | $156 | - | - |
$179
-
MMBtu
|
- | |
| 04 | 3.1161: Eliminate/reduce an operation | $600 | $620 | - | - | - | $600 | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $39 | $95 |
$39
412
kWh
|
- | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $577 | $2,755 |
$478
5,067
kWh
|
$99
-
kW-mo/yr
|
- | - | |
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $228 | $1,800 |
$228
2,401
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $2,604 | $5,946 |
$1,726
18,236
kWh
|
$99
-
kW-mo/yr
|
$179
-
MMBtu
|
$600 | ||
| TOTAL IMPLEMENTED | $1,121 | $2,975 |
$1,022
10,823
kWh
|
$99
-
kW-mo/yr
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs