Assessment Year | 2011 |
---|---|
Principal Product | Fuel Tanks, Aircraft Interior Completions and Maintenance |
NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 360 |
Plant Area |
212,794
ft2
|
Annual Production | 50
pieces
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Delaware |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $321,207 | 2,899,759 |
kWh
|
$0.11 |
LPG | $137,866 | 6,324 |
MMBtu
|
$21.80 |
Fuel Oil #2 | $16,050 | 853 |
MMBtu
|
$18.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $68,419 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $46,377 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,495 | $36,850 |
$20,495
184,640
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,207 | $27,090 |
$3,207
28,888
kWh
|
- | - | |
03 | 2.7221: Lower temperature during the winter season and vice-versa | $12,737 | $100 |
$4,169
37,560
kWh
|
$7,608
-
MMBtu
|
$960
-
MMBtu
|
|
04 | 2.6231: Utilize controls to operate equipment only when needed | $5,364 | $1,015 |
$5,364
48,321
kWh
|
- | - | |
05 | 2.2437: Recover waste heat from equipment | $7,317 | $350 |
$1,314
11,837
kWh
|
$4,818
-
MMBtu
|
$1,185
-
MMBtu
|
|
06 | 2.7243: Improve air circulation with destratification fans / other methods | $7,695 | $26,400 | - |
$7,695
-
MMBtu
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,834 | $15,000 |
$10,834
97,600
kWh
|
- | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $464 | $105 |
$464
4,182
kWh
|
- | - | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $306 | $360 |
$306
2,759
kWh
|
- | - | |
TOTAL RECOMMENDED | $68,419 | $107,270 |
$46,153
415,787
kWh
|
$20,121
-
MMBtu
|
$2,145
-
MMBtu
|
||
TOTAL IMPLEMENTED | $46,377 | $38,420 |
$31,806
286,540
kWh
|
$12,426
-
MMBtu
|
$2,145
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs