ITAC Assessment: OK1106
ITAC logo
ITAC Assessment: OK1106
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Industrial valves
NAICS 332911: Industrial Valve Manufacturing
SIC 3491: Industrial Valves
Sales Range $10
M
to 50
M
# of Employees 81
Plant Area 110,000
ft2
Annual Production 9,360
units
Production Hrs. Annual 2,808
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,280 775,332
kWh
Natural Gas $29,160 3,280
MMBtu
Waste Disposal Costs
Water Usage $1,378 335
Tgal
Water Disposal $1,699 335
Tgal
TOTAL YEARLY COSTS $134,517
RECOMMENDED SAVINGS* $58,323 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,199

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,422 $50,026 $10,422
78,958
kWh
-
02 2.9114: Use solar heat to make electricty $40,554 $187,200 $40,554
307,227
kWh
-
03 2.7231: Use radiant heater for spot heating $2,649 $5,850 - $2,649
-
MMBtu
04 2.7241: Install outside air damper / economizer on hvac unit $2,650 $8,580 $2,650
20,072
kWh
-
05 2.7211: Clean and maintain refrigerant condensers and towers $1,777 $4,495 $1,777
13,460
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $122 $602 $122
927
kWh
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $149 - $149
1,131
kWh
-
TOTAL RECOMMENDED $58,323 $256,753 $55,674
421,775
kWh
$2,649
-
MMBtu
TOTAL IMPLEMENTED $12,199 $54,521 $12,199
92,418
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs