Assessment Year | 2011 |
---|---|
Principal Product | extruded thermoplastics |
NAICS | 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 40 |
Plant Area |
40,000
ft2
|
Annual Production | 400,000,000
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Delaware |
View Case Study |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $136,160 | 1,215,720 |
kWh
|
$0.11 |
Electricity Demand | $56,024 | 6,260 |
kW-mo/yr
|
$8.95 |
Electricity Fees | $7,182 | - |
|
- |
Fuel Oil #2 | $5,598 | 247 |
MMBtu
|
$22.66 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,994 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $22,318 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.2691: Shut off cooling if cold outside air will cool process | $1,220 | $600 |
$1,220
10,900
kWh
|
|
02 | 2.4235: Remove or close off unneeded compressed air lines | $650 | - |
$650
5,820
kWh
|
|
03 | 2.7314: Reduce ventilation air | $4,520 | - |
$4,520
40,400
kWh
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,600 | $5,300 |
$2,600
23,300
kWh
|
|
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,970 | $2,390 |
$1,970
17,600
kWh
|
|
06 | 2.2511: Insulate bare equipment | $430 | $180 |
$430
3,800
kWh
|
|
07 | 2.4221: Install compressor air intakes in coolest locations | $710 | $100 |
$710
6,300
kWh
|
|
08 | 2.7232: Replace existing hvac unit with high efficiency model | $590 | $2,484 |
$590
5,270
kWh
|
|
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,676 | $1,800 |
$1,676
15,242
kWh
|
|
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,668 | $2,500 |
$6,668
60,627
kWh
|
|
11 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,960 | $4,000 |
$7,960
71,100
kWh
|
|
TOTAL RECOMMENDED | $28,994 | $19,354 |
$28,994
260,359
kWh
|
||
TOTAL IMPLEMENTED | $22,318 | $9,684 |
$22,318
200,417
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs