ITAC Assessment: UD0584
ITAC logo
ITAC Assessment: UD0584
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product printed metallic and polymeric sheets
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $1
M
to 5
M
# of Employees 31
Plant Area 55,000
ft2
Annual Production 1,586,200
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,307 941,090
kWh
Electricity Demand $47,106 3,348
kW-mo/yr
Natural Gas $15,492 3,182
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,086 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,086

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (haz) Savings Primary Raw Material Savings
01 3.8132: Use less toxic and volatile solvent substitutes $28,107 $3,150 - - - $17,100
-
lb
$11,007
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $998 $1,200 $785
29,015
kWh
$796
-
kW-mo/yr
$(-583.0)
-
MMBtu
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $981 $356 $392
14,654
kWh
$589
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $30,086 $4,706 $1,177
43,669
kWh
$1,385
-
kW-mo/yr
$(-583.0)
-
MMBtu
$17,100
-
lb
$11,007
TOTAL IMPLEMENTED $30,086 $4,706 $1,177
43,669
kWh
$1,385
-
kW-mo/yr
$(-583.0)
-
MMBtu
$17,100
-
lb
$11,007
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs