ITAC Assessment: SD0498
ITAC logo
ITAC Assessment: SD0498
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Corrugated paper boxes
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 43
Plant Area 245,000
ft2
Annual Production 80,001
pieces
Production Hrs. Annual 4,160
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,811 1,642,073
kWh
Electricity Demand $75,710 4,664
kW-mo/yr
Electricity Fees $17,403 -
Natural Gas $234,913 36,526
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,005 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,247

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2135: Repair and eliminate steam leaks $14,239 $1,000 - - $14,239
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $14,048 $21,000 - - $14,048
-
MMBtu
03 2.2162: Reduce excess steam bleeding $10,701 $14,842 - - $10,701
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,814 $500 $1,746
22,797
kWh
$1,068
-
kW-mo/yr
-
05 2.2121: Increase amount of condensate returned $3,194 $8,000 - - $3,194
-
MMBtu
06 2.7134: Use photocell controls $1,009 $440 $788
10,250
kWh
$221
-
kW-mo/yr
-
TOTAL RECOMMENDED $46,005 $45,782 $2,534
33,047
kWh
$1,289
-
kW-mo/yr
$42,182
-
MMBtu
TOTAL IMPLEMENTED $20,247 $9,500 $1,746
22,797
kWh
$1,068
-
kW-mo/yr
$17,433
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs