ITAC Assessment: MO0227
ITAC logo
ITAC Assessment: MO0227
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Chocolate Dairy Powders and Liquid Flavors
NAICS
n/a
SIC 2023: Dry, Condensed, and Evaporated Dairy Products
Sales Range $10
M
to 50
M
# of Employees 81
Plant Area 69,000
ft2
Annual Production 40,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $230,673 4,791,911
kWh
Electricity Demand $24,943 1,284
kW-mo/yr
Electricity Fees $30,817 -
Natural Gas $185,423 42,393
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $478,710 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,012

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 4.611: Begin a practice of predictive / preventative maintenance $3,155 $3,700 - - - $3,155
02 4.432: Cross-train personnel to avoid lost time $4,071 $9,000 - - - $4,071
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,132 $6,768 $2,860
52,169
kWh
$272
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $164 $276 $145
2,638
kWh
$19
-
kW-mo/yr
- -
05 2.4221: Install compressor air intakes in coolest locations $5,109 $139 $4,837
88,218
kWh
$272
-
kW-mo/yr
- -
06 2.4133: Use most efficient type of electric motors $10,138 $13,876 $9,594
174,971
kWh
$544
-
kW-mo/yr
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $469 - $450
8,206
kWh
$19
-
kW-mo/yr
- -
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $388,472 $100,000 - - $388,472
-
lb
-
09 3.1163: Use plastic pallets instead of wood $64,000 $31,500 - - $64,000
-
lb
-
TOTAL RECOMMENDED $478,710 $165,259 $17,886
326,202
kWh
$1,126
-
kW-mo/yr
$452,472
-
lb
$7,226
TOTAL IMPLEMENTED $19,012 $21,059 $17,886
326,202
kWh
$1,126
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs