Assessment Year | 2011 |
---|---|
Principal Product | Bread Crumbs |
NAICS | 311999: All Other Miscellaneous Food Manufacturing |
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 62 |
Plant Area |
104,000
ft2
|
Annual Production | 400,000
units
|
Production Hrs. Annual | 6,260
hrs
|
Location (State) | Maryland |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $557,960 | 5,534,939 |
kWh
|
$0.10 |
Natural Gas | $455,696 | 91,687 |
MMBtu
|
$4.97 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $132,354 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,435 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $2,960 | $1,035 | - |
$2,960
-
MMBtu
|
|
02 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $101,455 | $36,300 |
$92,260
922,600
kWh
|
$9,195
-
MMBtu
|
|
03 | 2.7444: Close holes and openings in building such as broken windows | $2,460 | $2,000 | - |
$2,460
-
MMBtu
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,015 | $4,000 |
$9,015
90,150
kWh
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,701 | $1,257 |
$1,701
17,011
kWh
|
- | |
06 | 2.4224: Upgrade controls on compressors | $12,600 | $10,000 |
$12,600
126,000
kWh
|
- | |
07 | 2.7243: Improve air circulation with destratification fans / other methods | $2,163 | $3,750 |
$(-252.0)
(-2,520)
kWh
|
$2,415
-
MMBtu
|
|
TOTAL RECOMMENDED | $132,354 | $58,342 |
$115,324
1,153,241
kWh
|
$17,030
-
MMBtu
|
||
TOTAL IMPLEMENTED | $14,435 | $7,035 |
$9,015
90,150
kWh
|
$5,420
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs