Assessment Year | 2011 |
---|---|
Principal Product | Magnesium chips, powders and pieces. |
NAICS | 331492: Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum) |
SIC | 3399: Primary Metal Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 33 |
Plant Area |
1,524,600
ft2
|
Annual Production | 1,500,000
lb
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $443,381 | 2,450,970 |
kWh
|
$0.18 |
Natural Gas | $7,195 | 480 |
MMBtu
|
$14.99 |
LPG | $6,422 | 430 |
MMBtu
|
$14.93 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $59,454 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,314 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $14,500 | $30,600 |
$14,500
80,000
kWh
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,000 | $22,400 |
$8,000
44,000
kWh
|
|
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,460 | $3,680 |
$5,460
30,000
kWh
|
|
04 | 2.4151: Develop a repair/replace policy | $3,970 | $1,158 |
$3,970
21,800
kWh
|
|
05 | 2.9114: Use solar heat to make electricty | $22,650 | $328,687 |
$22,650
124,435
kWh
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,834 | $2,409 |
$2,834
15,574
kWh
|
|
07 | 2.4322: Use or replace with energy efficient substitutes | $1,530 | $3,280 |
$1,530
8,400
kWh
|
|
08 | 2.4221: Install compressor air intakes in coolest locations | $510 | $50 |
$510
2,800
kWh
|
|
TOTAL RECOMMENDED | $59,454 | $392,264 |
$59,454
327,009
kWh
|
||
TOTAL IMPLEMENTED | $7,314 | $3,617 |
$7,314
40,174
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs