ITAC Assessment: DL0065
ITAC logo
ITAC Assessment: DL0065
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Magnesium chips, powders and pieces.
NAICS 331492: Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum)
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 33
Plant Area 1,524,600
ft2
Annual Production 1,500,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $443,381 2,450,970
kWh
Natural Gas $7,195 480
MMBtu
LPG $6,422 430
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,454 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,314

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4322: Use or replace with energy efficient substitutes $14,500 $30,600 $14,500
80,000
kWh
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,000 $22,400 $8,000
44,000
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,460 $3,680 $5,460
30,000
kWh
04 2.4151: Develop a repair/replace policy $3,970 $1,158 $3,970
21,800
kWh
05 2.9114: Use solar heat to make electricty $22,650 $328,687 $22,650
124,435
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,834 $2,409 $2,834
15,574
kWh
07 2.4322: Use or replace with energy efficient substitutes $1,530 $3,280 $1,530
8,400
kWh
08 2.4221: Install compressor air intakes in coolest locations $510 $50 $510
2,800
kWh
TOTAL RECOMMENDED $59,454 $392,264 $59,454
327,009
kWh
TOTAL IMPLEMENTED $7,314 $3,617 $7,314
40,174
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs