| Assessment Year | 2011 |
|---|---|
| Principal Product | Magnesium chips, powders and pieces. |
| NAICS | 331492: Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum) |
| SIC | 3399: Primary Metal Products, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 33 |
| Plant Area |
1,524,600
ft2
|
| Annual Production | 1,500,000
lb
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $443,381 | 2,450,970 |
kWh
|
$0.18 |
| Natural Gas | $7,195 | 480 |
MMBtu
|
$14.99 |
| LPG | $6,422 | 430 |
MMBtu
|
$14.93 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $59,454 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,314 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.4322: Use or replace with energy efficient substitutes | $14,500 | $30,600 |
$14,500
80,000
kWh
|
|
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,000 | $22,400 |
$8,000
44,000
kWh
|
|
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,460 | $3,680 |
$5,460
30,000
kWh
|
|
| 04 | 2.4151: Develop a repair/replace policy | $3,970 | $1,158 |
$3,970
21,800
kWh
|
|
| 05 | 2.9114: Use solar heat to make electricty | $22,650 | $328,687 |
$22,650
124,435
kWh
|
|
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,834 | $2,409 |
$2,834
15,574
kWh
|
|
| 07 | 2.4322: Use or replace with energy efficient substitutes | $1,530 | $3,280 |
$1,530
8,400
kWh
|
|
| 08 | 2.4221: Install compressor air intakes in coolest locations | $510 | $50 |
$510
2,800
kWh
|
|
| TOTAL RECOMMENDED | $59,454 | $392,264 |
$59,454
327,009
kWh
|
||
| TOTAL IMPLEMENTED | $7,314 | $3,617 |
$7,314
40,174
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs