ITAC Assessment: SF0047
ITAC logo
ITAC Assessment: SF0047
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Circuit Boards
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 165
Plant Area 39,692
ft2
Annual Production 1,740
thousand feet
Production Hrs. Annual 7,488
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $511,596 5,232,415
kWh
Natural Gas $49,048 8,267
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $128,899 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,573

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Primary Product Savings
01 2.4133: Use most efficient type of electric motors $1,510 $516 $1,510
15,533
kWh
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,565 $4,400 $12,565
128,664
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,063 $1,400 $3,063
31,360
kWh
- -
04 2.2136: Install / repair insulation on steam lines $1,794 $605 - $1,794
-
MMBtu
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,711 $4,400 $3,711
38,101
kWh
- -
06 2.3322: Use existing dam to generate electricity $59,850 $122,000 $(-150.0)
(-7,327)
kWh
- $60,000
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $46,406 $42,000 $65,896
674,091
kWh
$(-19,490.0)
-
MMBtu
-
TOTAL RECOMMENDED $128,899 $175,321 $86,595
880,422
kWh
$(-17,696.0)
-
MMBtu
$60,000
TOTAL IMPLEMENTED $4,573 $1,916 $4,573
46,893
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs