Assessment Year | 1995 |
---|---|
Principal Product | Circuit Boards |
NAICS |
n/a
|
SIC | 3672: Printed Circuit Boards |
Sales Range | $10 M to 50M |
# of Employees | 165 |
Plant Area |
39,692
ft2
|
Annual Production | 1,740
thousand feet
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $511,596 | 5,232,415 |
kWh
|
$0.098 |
Natural Gas | $49,048 | 8,267 |
MMBtu
|
$5.93 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $128,899 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,573 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $1,510 | $516 |
$1,510
15,533
kWh
|
- | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,565 | $4,400 |
$12,565
128,664
kWh
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,063 | $1,400 |
$3,063
31,360
kWh
|
- | - | |
04 | 2.2136: Install / repair insulation on steam lines | $1,794 | $605 | - |
$1,794
-
MMBtu
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,711 | $4,400 |
$3,711
38,101
kWh
|
- | - | |
06 | 2.3322: Use existing dam to generate electricity | $59,850 | $122,000 |
$(-150.0)
(-7,327)
kWh
|
- | $60,000 | |
07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $46,406 | $42,000 |
$65,896
674,091
kWh
|
$(-19,490.0)
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $128,899 | $175,321 |
$86,595
880,422
kWh
|
$(-17,696.0)
-
MMBtu
|
$60,000 | ||
TOTAL IMPLEMENTED | $4,573 | $1,916 |
$4,573
46,893
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs