Assessment Year | 2010 |
---|---|
Principal Product | Lubricating Oils |
NAICS | 324191: Petroleum Lubricating Oil and Grease Manufacturing |
SIC | 2992: Lubricating Oils and Greases |
Sales Range | $100 M to 500M |
# of Employees | 130 |
Plant Area |
1,650,000
ft2
|
Annual Production | 95,000
Tgal
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $743,199 | 9,075,138 |
kWh
|
$0.082 |
Natural Gas | $539,696 | 67,231 |
MMBtu
|
$8.03 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $504,753 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $206,204 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2135: Repair and eliminate steam leaks | $184,560 | $1,200,000 | - |
$184,560
-
MMBtu
|
|
02 | 2.6125: Keep equipment clean | $162,929 | $102,000 | - |
$162,929
-
MMBtu
|
|
03 | 2.4226: Use / purchase optimum sized compressor | $42,720 | $1,940 |
$42,720
479,940
kWh
|
- | |
04 | 2.2511: Insulate bare equipment | $45,700 | $7,900 | - |
$45,700
-
MMBtu
|
|
05 | 2.4239: Eliminate or reduce compressed air usage | $14,000 | $300 |
$14,000
158,000
kWh
|
- | |
06 | 2.2211: Use optimum temperature | $7,644 | $100 | - |
$7,644
-
MMBtu
|
|
07 | 2.6231: Utilize controls to operate equipment only when needed | $5,100 | $100 |
$5,100
56,000
kWh
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $35,000 | $94,500 |
$35,000
385,000
kWh
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,100 | $58,000 |
$7,100
78,000
kWh
|
- | |
TOTAL RECOMMENDED | $504,753 | $1,464,840 |
$103,920
1,156,940
kWh
|
$400,833
-
MMBtu
|
||
TOTAL IMPLEMENTED | $206,204 | $1,200,400 |
$14,000
158,000
kWh
|
$192,204
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs