ITAC Assessment: MZ0016
ITAC logo
ITAC Assessment: MZ0016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product electrica heaters and heating elements
NAICS 333414: Heating Equipment (except Warm Air Furnaces) Manufacturing
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $1
M
to 5
M
# of Employees 86
Plant Area 44,000
ft2
Annual Production 60,000
pieces
Production Hrs. Annual 5,100
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,188 1,273,128
kWh
Natural Gas $42,973 3,780
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,740 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,880

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,548 $2,135 $8,548
135,660
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,880 $1,120 $6,880
27,293
kWh
-
03 2.2442: Preheat combustion air with waste heat $4,312 $3,000 - $4,312
-
MMBtu
TOTAL RECOMMENDED $19,740 $6,255 $15,428
162,953
kWh
$4,312
-
MMBtu
TOTAL IMPLEMENTED $6,880 $1,120 $6,880
27,293
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs