ITAC Assessment: DL0042
ITAC logo
ITAC Assessment: DL0042
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Refrigerator
NAICS 423740: Refrigeration Equipment and Supplies Merchant Wholesalers
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 93
Plant Area 230,000
ft2
Annual Production 12,200
pieces
Production Hrs. Annual 4,080
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $314,600 2,560,000
kWh
Natural Gas $97,600 6,600
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,928 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,956

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $1,756 - $1,756
14,280
kWh
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $10,180 $19,200 - $10,180
-
MMBtu
03 2.7491: Insulate glazing, walls, ceilings, and roofs $28,200 $1,760 $28,200
230,000
kWh
-
04 2.7131: Add area lighting switches $11,009 $1,325 $11,009
89,505
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $2,332 $368 $2,332
18,962
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $982 $500 $982
7,986
kWh
-
07 2.7243: Improve air circulation with destratification fans / other methods $18,600 $36,600 - $18,600
-
MMBtu
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,400 $41,000 $16,400
133,000
kWh
-
09 2.7425: Clean or color roof to reduce solar load $469 $4,845 $247
5,664
kWh
$222
-
MMBtu
TOTAL RECOMMENDED $89,928 $105,598 $60,926
499,397
kWh
$29,002
-
MMBtu
TOTAL IMPLEMENTED $29,956 $1,760 $29,956
244,280
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs