ITAC Assessment: KU0160
ITAC logo
ITAC Assessment: KU0160
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product ELECTRONIC COMPONENTS
NAICS
n/a
SIC 3678: Electronic Connectors
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area
n/a
Annual Production 1,500,000
pieces
Production Hrs. Annual 2,375
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,391 473,036
kWh
Natural Gas $3,229 768
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,081 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,089

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,445 $10,000 $5,445
75,029
kWh
-
02 2.2511: Insulate bare equipment $1,982 $900 $2,259
31,067
kWh
$(-277.0)
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,662 $2,000 $1,662
22,860
kWh
-
04 2.2511: Insulate bare equipment $371 $192 $426
5,862
kWh
$(-55.0)
-
MMBtu
05 2.2511: Insulate bare equipment $188 $60 $213
2,931
kWh
$(-25.0)
-
MMBtu
06 2.7224: Reduce space conditioning during non-working hours $433 $200 - $433
-
MMBtu
TOTAL RECOMMENDED $10,081 $13,352 $10,005
137,749
kWh
$76
-
MMBtu
TOTAL IMPLEMENTED $9,089 $12,900 $9,366
128,956
kWh
$(-277.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs