| Assessment Year | 2009 |
|---|---|
| Principal Product | Stainless tubes |
| NAICS | 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel |
| SIC | 3317: Steel Pipe and Tubes |
| Sales Range | $10 M to 50M |
| # of Employees | 135 |
| Plant Area |
100,000
ft2
|
| Annual Production | 2,000,000
lb
|
| Production Hrs. Annual | 8,640
hrs
|
| Location (State) | Delaware |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $840,000 | 7,500,000 |
kWh
|
$0.11 |
| Natural Gas | $186,000 | 16,983 |
MMBtu
|
$10.95 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $81,268 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $21,802 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1321: Replace fossil fuel equipment with electrical equipment | $29,782 | - | - |
$29,782
-
MMBtu
|
|
| 02 | 2.7111: Reduce illumination to minimum necessary levels | $20,570 | $372 |
$20,570
187,000
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,474 | $10,800 |
$8,474
77,037
kWh
|
- | |
| 04 | 2.2437: Recover waste heat from equipment | $4,029 | $1,430 | - |
$4,029
-
MMBtu
|
|
| 05 | 2.2136: Install / repair insulation on steam lines | $3,520 | $400 | - |
$3,520
-
MMBtu
|
|
| 06 | 2.6231: Utilize controls to operate equipment only when needed | $3,714 | $1,000 |
$3,714
33,760
kWh
|
- | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $3,000 | $348 |
$3,000
27,000
kWh
|
- | |
| 08 | 2.7314: Reduce ventilation air | $5,400 | $6,300 |
$5,400
25,325
kWh
|
- | |
| 09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,779 | $3,858 |
$2,779
24,330
kWh
|
- | |
| TOTAL RECOMMENDED | $81,268 | $24,508 |
$43,937
374,452
kWh
|
$37,331
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $21,802 | $16,836 |
$14,253
128,367
kWh
|
$7,549
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs