| Assessment Year | 2009 |
|---|---|
| Principal Product | Prefabricated Houses |
| NAICS | 321992: Prefabricated Wood Building Manufacturing |
| SIC | 2452: Prefabricated Wood Buildings and Components |
| Sales Range | $10 M to 50M |
| # of Employees | 92 |
| Plant Area |
120,000
ft2
|
| Annual Production | 158
units
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Delaware |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $78,322 | 62,902 |
kWh
|
$1.25 |
| Natural Gas | $36,545 | 2,479 |
MMBtu
|
$14.74 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $47,272 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $20,189 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $9,947 | $25,000 |
$9,947
83,592
kWh
|
- | |
| 02 | 2.2437: Recover waste heat from equipment | $2,331 | $2,350 | - |
$2,331
-
MMBtu
|
|
| 03 | 2.4321: Upgrade obsolete equipment | $3,215 | - |
$3,215
27,023
kWh
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,110 | $3,000 |
$1,110
9,331
kWh
|
- | |
| 05 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $12,823 | $14,899 | - |
$12,823
-
MMBtu
|
|
| 06 | 2.7261: Install timers and/or thermostats | $4,313 | $2,804 | - |
$4,313
-
MMBtu
|
|
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,533 | $38,218 |
$13,533
113,722
kWh
|
- | |
| TOTAL RECOMMENDED | $47,272 | $86,271 |
$27,805
233,668
kWh
|
$19,467
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $20,189 | $43,568 |
$17,858
150,076
kWh
|
$2,331
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs