ITAC Assessment: MO0006
ITAC logo
ITAC Assessment: MO0006
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product FABRICATED STEEL
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area
n/a
Annual Production 7,000
ton
Production Hrs. Annual 4,250
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $185,762 2,311,548
kWh
Natural Gas $6,520 1,254
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,529 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,283

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4221: Install compressor air intakes in coolest locations $8,585 $171 $8,585
106,682
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $246 $65 $246
2,931
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $698 - $698
8,792
kWh
TOTAL RECOMMENDED $9,529 $236 $9,529
118,405
kWh
TOTAL IMPLEMENTED $9,283 $171 $9,283
115,474
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs