ITAC Assessment: OK0337
ITAC logo
ITAC Assessment: OK0337
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product AUTOMOBILE ENGINES
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 1,000
Plant Area
n/a
Annual Production 74,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,516,445 36,043,084
kWh
Natural Gas $285,043 131,998
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $208,624 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $208,624

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $59,130 $29,025 - $59,130
-
MMBtu
-
02 2.2511: Insulate bare equipment $24,414 $1,184 $13,846
308,910
kWh
$10,568
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,667 - $2,622
58,617
kWh
- $45
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $758 - $758
21,395
kWh
- -
05 2.7261: Install timers and/or thermostats $43,178 $4,650 $26,200
733,880
kWh
$16,978
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $51,940 - $44,478
824,736
kWh
- $7,462
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $26,537 $26,342 $26,537
541,618
kWh
- -
TOTAL RECOMMENDED $208,624 $61,201 $114,441
2,489,156
kWh
$86,676
-
MMBtu
$7,507
TOTAL IMPLEMENTED $208,624 $61,201 $114,441
2,489,156
kWh
$86,676
-
MMBtu
$7,507
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs