| Assessment Year | 1991 |
|---|---|
| Principal Product | AUTOMOBILE ENGINES |
| NAICS |
n/a
|
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $100 M to 500M |
| # of Employees | 1,000 |
| Plant Area |
n/a
|
| Annual Production | 74,000
pieces
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,516,445 | 36,043,084 |
kWh
|
$0.042 |
| Natural Gas | $285,043 | 131,998 |
MMBtu
|
$2.16 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $208,624 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $208,624 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2414: Use waste heat from hot flue gases to preheat | $59,130 | $29,025 | - |
$59,130
-
MMBtu
|
- | |
| 02 | 2.2511: Insulate bare equipment | $24,414 | $1,184 |
$13,846
308,910
kWh
|
$10,568
-
MMBtu
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,667 | - |
$2,622
58,617
kWh
|
- | $45 | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $758 | - |
$758
21,395
kWh
|
- | - | |
| 05 | 2.7261: Install timers and/or thermostats | $43,178 | $4,650 |
$26,200
733,880
kWh
|
$16,978
-
MMBtu
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $51,940 | - |
$44,478
824,736
kWh
|
- | $7,462 | |
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $26,537 | $26,342 |
$26,537
541,618
kWh
|
- | - | |
| TOTAL RECOMMENDED | $208,624 | $61,201 |
$114,441
2,489,156
kWh
|
$86,676
-
MMBtu
|
$7,507 | ||
| TOTAL IMPLEMENTED | $208,624 | $61,201 |
$114,441
2,489,156
kWh
|
$86,676
-
MMBtu
|
$7,507 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs