Assessment Year | 1998 |
---|---|
Principal Product | Jigs fixtures,tools and die machinery |
NAICS |
n/a
|
SIC | 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds |
Sales Range | $10 M to 50M |
# of Employees | 65 |
Plant Area |
50,000
ft2
|
Annual Production | 50,000
pieces
|
Production Hrs. Annual | 3,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $33,055 | 1,271,688 |
kWh
|
$0.026 |
Electricity Demand | $62,977 | 4,476 |
kW-mo/yr
|
$14.07 |
Natural Gas | $13,704 | 2,779 |
MMBtu
|
$4.93 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,280 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,225 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 3.3128: Utilize other methods to remove contaminants | $2,243 | - | - | - | - |
$630
-
gal
|
$(-825.0) | - | $2,438 | |
02 | 2.5125: Size air handling grills/ duct/s coils to minimize air resistance | $7,607 | $720 |
$744
28,722
kWh
|
$1,604
-
kW-mo/yr
|
- | - | - | $5,259 | - | |
03 | 2.4226: Use / purchase optimum sized compressor | $2,274 | $300 |
$640
24,619
kWh
|
$1,384
-
kW-mo/yr
|
- | - | - | $250 | - | |
04 | 2.7141: Lower light fixtures in high ceiling areas | $2,375 | $1,120 |
$751
29,015
kWh
|
$1,624
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $781 | $2,000 |
$153
5,862
kWh
|
- |
$628
-
MMBtu
|
- | - | - | - | |
TOTAL RECOMMENDED | $15,280 | $4,140 |
$2,288
88,218
kWh
|
$4,612
-
kW-mo/yr
|
$628
-
MMBtu
|
$630
-
gal
|
$(-825.0) | $5,509 | $2,438 | ||
TOTAL IMPLEMENTED | $12,225 | $1,840 |
$1,495
57,737
kWh
|
$3,228
-
kW-mo/yr
|
- |
$630
-
gal
|
$(-825.0) | $5,259 | $2,438 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs