ITAC Assessment: UD0548
ITAC logo
ITAC Assessment: UD0548
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Jigs fixtures,tools and die machinery
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 50,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 3,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,055 1,271,688
kWh
Electricity Demand $62,977 4,476
kW-mo/yr
Natural Gas $13,704 2,779
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,280 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,225

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 3.3128: Utilize other methods to remove contaminants $2,243 - - - - $630
-
gal
$(-825.0) - $2,438
02 2.5125: Size air handling grills/ duct/s coils to minimize air resistance $7,607 $720 $744
28,722
kWh
$1,604
-
kW-mo/yr
- - - $5,259 -
03 2.4226: Use / purchase optimum sized compressor $2,274 $300 $640
24,619
kWh
$1,384
-
kW-mo/yr
- - - $250 -
04 2.7141: Lower light fixtures in high ceiling areas $2,375 $1,120 $751
29,015
kWh
$1,624
-
kW-mo/yr
- - - - -
05 2.4221: Install compressor air intakes in coolest locations $781 $2,000 $153
5,862
kWh
- $628
-
MMBtu
- - - -
TOTAL RECOMMENDED $15,280 $4,140 $2,288
88,218
kWh
$4,612
-
kW-mo/yr
$628
-
MMBtu
$630
-
gal
$(-825.0) $5,509 $2,438
TOTAL IMPLEMENTED $12,225 $1,840 $1,495
57,737
kWh
$3,228
-
kW-mo/yr
- $630
-
gal
$(-825.0) $5,259 $2,438
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs