| Assessment Year | 2009 |
|---|---|
| Principal Product | Electro Mechanical Assembly |
| NAICS | 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing |
| SIC | 3679: Electronic Components, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 71 |
| Plant Area |
18,000
ft2
|
| Annual Production | 12,000,000
units
|
| Production Hrs. Annual | 2,964
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $77,242 | 625,200 |
kWh
|
$0.12 |
| Natural Gas | $4,844 | 320 |
MMBtu
|
$15.14 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $24,533 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,047 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $4,047 | - |
$4,047
23,808
kWh
|
|
| 02 | 3.2136: Use "wash-less" processing equipment | $4,000 | - |
$4,000
24,000
kWh
|
|
| 03 | 2.7131: Add area lighting switches | $5,647 | $3,600 |
$5,647
29,344
kWh
|
|
| 04 | 2.6231: Utilize controls to operate equipment only when needed | $1,511 | $263 |
$1,511
8,892
kWh
|
|
| 05 | 2.4221: Install compressor air intakes in coolest locations | $248 | $150 |
$248
1,458
kWh
|
|
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,580 | $2,450 |
$1,580
9,470
kWh
|
|
| 07 | 2.7243: Improve air circulation with destratification fans / other methods | $7,500 | $4,700 |
$7,500
45,000
kWh
|
|
| TOTAL RECOMMENDED | $24,533 | $11,163 |
$24,533
141,972
kWh
|
||
| TOTAL IMPLEMENTED | $8,047 | - |
$8,047
47,808
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs