ITAC Assessment: TS0027
ITAC logo
ITAC Assessment: TS0027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product BOAT WINDSHIELDS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,080
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $15,798 228,019
kWh
Natural Gas $21,022 3,786
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,802 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,195 $216 $1,195
16,999
kWh
-
02 2.7492: Use proper thickness of insulation on building envelope $2,348 $3,929 - $2,348
-
MMBtu
03 2.7494: Install storm windows and doors $916 $1,275 - $916
-
MMBtu
04 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $555 $500 - $555
-
MMBtu
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,684 - $1,684
-
kWh
-
06 2.7111: Reduce illumination to minimum necessary levels $104 - $104
1,758
kWh
-
TOTAL RECOMMENDED $6,802 $5,920 $2,983
18,757
kWh
$3,819
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs