ITAC Assessment: DL0016
ITAC logo
ITAC Assessment: DL0016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Fabricated Architectural Glass
NAICS 339999: All Other Miscellaneous Manufacturing
SIC 5039: Construction Materials, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 183,000
ft2
Annual Production 16,000
thousand feet
Production Hrs. Annual 7,488
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $731,400 731,400
kWh
Electricity Demand $43,400 43,400
kW-mo/yr
Natural Gas $167 12,330
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $103,668 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,917

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4224: Upgrade controls on compressors $19,500 $1,000 $19,500
150,000
kWh
-
02 2.6218: Turn off equipment when not in use $12,550 - $10,800
83,000
kWh
$1,750
-
kW-mo/yr
03 2.6231: Utilize controls to operate equipment only when needed $11,172 $700 $11,172
85,938
kWh
-
04 2.7135: Install occupancy sensors $3,343 $590 $3,343
25,718
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,304 $500 $2,304
17,725
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $635 $160 $635
4,887
kWh
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $24 $2,394 $24
10,290
kWh
-
08 2.2414: Use waste heat from hot flue gases to preheat $38,540 $125,000 $38,540
2,840
kWh
-
09 2.9114: Use solar heat to make electricty $15,600 $600,000 $15,600
120,000
kWh
-
TOTAL RECOMMENDED $103,668 $730,344 $101,918
500,398
kWh
$1,750
-
kW-mo/yr
TOTAL IMPLEMENTED $15,917 $2,984 $14,167
119,008
kWh
$1,750
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs