ITAC Assessment: CW0111
ITAC logo
ITAC Assessment: CW0111
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product auto parts
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 65,000
ft2
Annual Production 3,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $314,645 2,545,200
kWh
Natural Gas $35,031 5,738
MMBtu
Waste Disposal Costs
Water Usage $15,703 2,104
Tgal
Water Disposal $13,395 2,104
Tgal
Other Liquid (non-haz) $919 2,104
gal
TOTAL YEARLY COSTS $379,692
RECOMMENDED SAVINGS* $73,920 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $69,932

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Ancillary Material Cost Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $577 $50 $577
4,655
kWh
- - -
02 2.4234: Cool compressor air intake with heat exchanger $1,231 $200 $1,231
9,926
kWh
- - -
03 2.4226: Use / purchase optimum sized compressor $2,856 - $2,856
22,856
kWh
- - -
04 2.7135: Install occupancy sensors $1,147 $3,000 $1,147
9,254
kWh
- - -
05 3.5131: Recycle white water $1,133 - - - $1,133
-
Tgal
-
06 3.4132: Use deionized water in upstream rinse tanks $39,911 $4,800 - $39,911 - -
07 2.2626: Avoid frost formation on evaporators $27,066 $28,000 $18,666
150,532
kWh
- - $8,400
TOTAL RECOMMENDED $73,920 $36,050 $24,477
197,223
kWh
$39,911 $1,133
-
Tgal
$8,400
TOTAL IMPLEMENTED $69,932 $36,050 $21,621
174,367
kWh
$39,911 - $8,400
Yearly Savings* Imp'd Cost* Electricity Usage Savings Ancillary Material Cost Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs